PLC transporter
Two wagons × 1,500 kg; recipe-controlled dipping and draining
All specifications and capacity are for the planned plant; they are not claims of operational, commissioned capacity. Actual maximum part size depends on fixture design and anode clearance.
EQUIPMENT PREVIEW
These four illustrations are reproduced from SVSC's own brochure. They are artist's impressions of proposed equipment, not photographs of an installed facility.

Two wagons × 1,500 kg; recipe-controlled dipping and draining

14 m × 2.8 m × 2.5 m; Riello system and 70 m conveyor

Four automatic guns plus two manual guns; powder recovery

Salt spray, DFT, adhesion, cure and bath analysis
COMPLETE PLANNED EQUIPMENT SCHEDULE
| Equipment / system | Brochure specification |
|---|---|
| CED line | 18 tanks; MS with 3 mm FRP lining; three tanks MS + PPH |
| Transporter | PLC-controlled; 2 wagons × 1,500 kg lifting capacity |
| Job handling | 8 job-hanging baskets; 8 base trolleys; trolley track |
| Rectifier & anodes | 250 V / 350 A rectifier; 8 tubular anode cells |
| CED bath cooling | 5 TR air-cooled chiller |
| Circulation & filtration | 8 pumps; 8 bag filters; closed-loop ultrafiltration |
| Degreasing & heating | 2 oil skimmers; 4 heated stages with automatic temperature control |
| Sludge filter press | 24 plates, each 18 × 18 inches |
| Camel-back oven | 14 m L × 2.8 m W × 2.5 m H; Riello FS10 heat exchanger |
| Overhead conveyor | 70 m closed type; 45 kg per hook; 300 mm pitch; automatic lubrication |
| Powder booth | 15 × 4 × 8.5 ft (approx. 4.6 × 1.2 × 2.6 m); SS multi-cyclone recovery; cartridge dust collector |
| Powder guns | 4 automatic + 2 manual (Mitsuba); automatic gun cut-out 1,250 mm |
| Batch oven | 9.5 × 6 × 14 ft (approx. 2.9 × 1.8 × 4.3 m); Riello FS20, for larger parts |
| Heating fuel | LPG gas bank with vaporiser; 7,00,000 kcal/hr |
| Compressed air | 2 × 10 HP compressors; 500 L receivers; air dryer |
| Water & effluent | Demineralised water plant 500 LPH; ETP 5 KLD; 3 HP acid/alkali fume scrubber |
PART FIT & ENGINEERING REVIEW
Minimum clearance, hole geometry, hanging direction and part orientation influence whether a job can be processed effectively.