Coating tests
- Salt spray chamber · ASTM B117
- Dry film thickness · DFT gauge
- Adhesion · cross-hatch, ISO 2409
- Cure · MEK solvent rub
- Gloss, impact and pencil hardness
- Throw power · CED box test
- Flexibility · conical mandrel bend
PLANNED IN-HOUSE QUALITY CONTROL
According to the brochure, the intended laboratory will verify both finished components and process conditions. Dispatch test reports are planned to support customer PPAP documentation.
Equipment and test-program details describe the planned facility, not tests already completed at the new site.
ENVIRONMENTAL DESIGN
SVSC's brochure describes an environmentally focused plant design incorporating water recovery, effluent treatment, fume control and reduced coating waste.
Planned treatment of rinse-water effluent on site
Recycled water and cascading rinses to reduce water use
Return coating drag-out to the bath
3 HP acid/alkali fume scrubber on pretreatment
Stainless-steel multi-cyclone powder recovery
Improve loading efficiency and reduce fuel consumption per part

MANAGEMENT SYSTEMS
The brochure identifies these as target management-system certifications. They have not been presented as achieved or certified.
Also planned: Maharashtra Pollution Control Board (MPCB) Consent to Operate and MSME ZED certification. The brochure describes an MPCB-compliant design; statutory approval is not implied.
TAKE THE NEXT STEP
Share dimensions, coating specifications and monthly volume. We will discuss the process, jigging and commercial requirements.