UPCOMING PROJECT  ·  Planned start of production: 15 February 2027Now accepting trial enquiries

UPCOMING AUTOMATED PLANT · CHH. SAMBHAJINAGAR

CATHODIC ELECTRO-DEPOSITION · POWDER · LIQUID

CORROSION
PROTECTION,
DOWN TO THE
LAST CORNER.

A planned automated job-coating facility serving automotive and engineering components. Built around controlled pretreatment, CED, and optional powder or liquid top coats.

Planned SOP 15 Feb 2027 MIDC, Chhatrapati Sambhajinagar
THE PLANNED 18-STAGE CED LINE
Artist’s illustration of SVSC’s planned automated 18-tank CED line with two transporter wagons

Illustration from SVSC's brochure · Not an installed plant photograph

DESIGNED CAPACITY1,00,000 m²per month · planned
22 years

Vinod Deokar's surface-finishing experience

7 plants

Previously set up and operated by the leadership

18 stages

Planned automated CED tank sequence

1,500 kg

Planned lifting capacity per transporter wagon

01 / OUR COATING CAPABILITIES

Three finishes.
One pretreatment approach.

SVSC's planned job-coating services bring cathodic electro-deposition, powder coating and liquid painting together at one site, sharing a common pretreatment line.

01 / PRIMARY PROCESS

CED coating

Water-borne epoxy electrodeposition for uniform corrosion-protective primer coverage, including appropriate enclosed or recessed areas.

Learn more ↗
02 / FINISH

Powder coating

Planned automated and manual application with powder recovery, plus oven capacity for coated components.

Learn more ↗
03 / FINISH

Liquid painting

Liquid coating as a standalone finishing option or a top coat over a specified CED primer system.

Learn more ↗

02 / PURPOSE-BUILT FOR CONSISTENCY

18 stages.
One automated transporter system.

The proposed CED process progresses through cleaning, zinc-phosphate conversion, electrodeposition and rinse recovery. PLC recipes are intended to control immersion and draining times.

  • Two PLC-controlled transporter wagons
  • Closed-loop UF recovery and automatic cascading rinses
  • In-house stoving oven and test laboratory planned
See all 18 stages →
Artist's illustration of the planned PLC-controlled CED transporterPLANNED EQUIPMENT · ARTIST'S IMPRESSION

03 / TARGET APPLICATIONS

Designed for the
Marathwada auto cluster.

Positioned near Waluj, Shendra and AURIC, the planned facility is intended to support local OEM, Tier-1 and industrial component supply chains.

Chassis & frame partsBrackets & pressingsTwo- & three-wheelersEV battery trays & enclosuresTractors & farm equipmentElectrical panels & fabrications

04 / CURRENT PROJECT STATUS

Building towards
15 February 2027.

SVSC is an upcoming facility. Equipment finalisation, site preparation, commissioning, customer trials and initial approvals are scheduled ahead of planned production.

View project milestones ↗

TAKE THE NEXT STEP

Reserve your evaluation slot.

Send a component drawing, required coating specification and anticipated monthly volume to plan a sample trial or quotation.

Discuss your requirement